Bathroom Rehab

Continuing the basement renovation meant rehabbing the second full bathroom – fortunately, all the important elements were there which made it easier to complete.  I knew I wanted to do a board and batten on the walls and use travertine in the shower so after that there wasn’t much to decide on except paint color. Since we had some leftover from our bedroom reno, we went with Benjamin Moore Smoke on the top half of the walls and painted the board and batten the same color White Dove which we used through-out the house on the trim.  Gavin made all the board and batten trim by hand and installed all of the tile in the shower and I just love how it turned out.  We ordered a glass shower door which is in but not installed yet but this way I can share a better picture of the tile work without the door on.

Before pictures:

DSC_1001

DSC_1003

DSC_1002

After pics:

IMG_3633

IMG_3635

IMG_3636

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s